Littleton High School (Colorado)

199 E Littleton Blvd, Littleton, CO 80121
Littleton High School (Colorado) Littleton High School (Colorado) is one of the popular Local Business located in 199 E Littleton Blvd ,Littleton listed under High School in Littleton , Local business in Littleton ,

Contact Details & Working Hours

More about Littleton High School (Colorado)

Littleton High School is a public high school located in Littleton, Colorado, United States. It is a part of the Littleton Public Schools school district.HistoryThe first Littleton High School building was finished in 1920 and initially served 20 students. In 1935, funding was acquired to construct three new wings to double the floor space and reduce the overcrowding due to the increasing number of students.In 1956-58 the original school building was converted into Grant Junior High School. Improvements were designed by architect Alfred Watts, including a one-story cafeteria with kitchen and six additional classrooms. An annex was added in 1958 to provide space for a music room, shop, home economics rooms, and labs. The additions of 1956-58 were built in a modern 1950s style, emphasizing larger windows and different shades of brick. In 1958, a football field was added at the east end of the site and tennis courts were constructed near the corner of Littleton Boulevard and Windermere Street. The Grant Junior High building was later converted into use by the Littleton School District as administrative offices.The current Littleton High School, located at 199 E. Littleton Boulevard, was completed in 1956. It was designed by Earl C. Morris and built by Mead & Mount. A 1958 addition added 7092sqft of classrooms and was designed and built by the same companies for $87,875. In 1961, 78000sqft of new classrooms were added for $1,235,000. Earl C. Morris also designed this addition, with general contracting work completed by Weaver Construction Company. Langfur Construction Co. completed remodeling behind the stage in 1968, with designs by Bourn & Dulaney. A new swimming pool was added in 1969 for $394,369. The architect was Nixon-Brown-Brokaw-Bowen, and the contractor was Hezlep Construction Co. A new 1200sqft shop area was designed by Nixon-Brown-Brokaw-Bowen and built by Weaver Construction in 1979. The auditorium was remodeled and enlarged by 2400sqft in 1985. That project went to Allred/Fisher architects and Van I. Warden general contractors. These additions more than doubled the original size of the high school. The gymnasium is one of few in the area to still have balcony seating.

Map of Littleton High School (Colorado)